Projects

Drinks Concentrate Manufacturing

This facility was constructed and commissioned within a former Lidl warehouse building. The project involved an ATEX rated tank farm, warehouse, mixing vessels, CIP system and filling lines.

Services provided included detailed design including process, mechanical and electrical engineering design, procurement of equipment & contracts. Construction site monitoring and commissioning assistance. Scope also included conducting HAZOP reviews and preparation of an Explosion Protection Document (EPD).

Client:

Dr Pepper

Location:

Ireland

Services:

Sectors:

Industrial

Sub‑sector:

Industrial Food & Beverage

Period:

2019/2021

Ready to join the team?

If you think you have what it takes to join an award winning team and help RED continue its exciting journey, we want to hear from you.

Search Open Positions