Projects

Allied Irish Bank

Callaghan|RED were tasked to review the existing electrical MV and LV infrastructure at the AIB Headquarters in Dublin. AIB wanted to build in additional resilience and add back-up capability to their existing system in order to prevent potentially lengthy power outages in the event of transformer and/or switchgear failure.

As part of the review, Callaghan|RED were required to develop and cost several options that would improve the power resilience capability within the bank centre itself. Our engineers subsequently delivered a front end study which outlined the various solutions available and identified a preferred option for the client.

Client:

AIB

Location:

Ireland

Services:

MEP Services

Sectors:

Commercial

Sub‑sector:

Offices

Period:

2018

Ready to join the team?

If you think you have what it takes to join an award winning team and help Callaghan|RED continue its exciting journey, we want to hear from you.