Callaghan Engineering were responsible for the M&E Design from concept stage to building completion.   The post primary school is a two-storey and part 3-storey L-shaped building with a floor area of 3852 square metres located on this spectacular sloping site outside Clifden town.  Works also included the demolition of the existing school building and associated pre-fabricated classroom structures once the new school was fully operational. One of the main challenges for this project was that the existing school building had to be kept operational while the new school was built on the same site. The building was completed on time and within budget and will cater for 425 pupils and 38 staff.