News

Bray Primary Care Centre

Callaghan Engineering were appointed in 2013, as the Mechanical and Electrical designers for the new Primary Care Centre in Bray, Co. Wicklow.  Following a protracted planning phase the construction is now well underway with the start of the mechanical and electrical services being installed within the building. The building will house several medical clinics on completion including GP, mental health, occupational therapy, physiotherapy and dental. An ‘A’ rating has been achieved in design for the BER building energy rating. Some of the mechanical and electrical features incorporated into the design include air source heat-pumps, rainwater harvesting and LED controlled lights.

An ‘A’ rating has been achieved in design for the BER building energy rating. Some of the mechanical and electrical features incorporated into the design include air source heat-pumps, rainwater harvesting and LED controlled lights.

With multiple tenants, including a pharmacy and cafe, an elaborate security and access control system is in place to manage the movement of staff and customers throughout. The construction will be completed towards the end of 2019.