Braun Oral-B Facility Relocation
Callaghan Engineering is pleased to note that Braun Oral-B has successfully completed the transfer of its facility from Carlow to Newbridge with production now underway in the new location.
In order to meet the challenges presented by moving a complete production facility from one location to another Callaghan Engineering together with Clifton Scannell Emerson Associates (Civil/Structural Engineers) fostered a collaborative and proactive ethos amongst all participants from the outset. The management of Braun Oral-B were enthusiastic and flexible in their support, helping to ensure effective resource management in a multi-faceted project involving input from technical sources across the EU.
By working in direct collaboration with both the Braun Oral-B project team & multiple third party contributors during the initial & detailed engineering design phases, Callaghan Engineering was able to ensure a smooth transition, and also to streamline the commissioning phase with consequent cost savings to the client.
Callaghan Engineering congratulates Braun Oral-B on the successful transfer of this facility, and we wish them continued success in the new location.
